Sample Unit Cost Entries (3 unique unit cost entries found)
Unit Cost Entries for Software, Integration for Freeway Control
| Unit Cost Element | Unit Cost Component | Description | Location | Cost Type | Data Date | Reported Units | Units | Year (Dollars) | Capital Cost Per Unit | O& M Cost Per Unit | Lifetime (Years) | View Details |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Software, Integration for Freeway Control | Software, Integration for Freeway Control | Software is an ATMS freeway/arterial software package developed by the IBI Group, Toronto, Ontario, Canada. There was no name or model for the software package. Software costs include the software and installation, no other costs (cost to operate) are included. O&M costs are for yearly software updates and includes installation and test of the update. Labor to operate and maintain the software is not included. | Boise, Idaho, USA | Actual | 2003 | Lump Sum (LS) | 2003 | $150,000.00 | $25,000.00 | 20 | View Details | |
| Software, Integration for Freeway Control | TMC Software/Integration | for Central Control Ramp Metering | California, USA | Estimated | 2007 | Lump Sum (LS) | 2007 | $200,000.00 | View Details | |||
| Software, Integration for Freeway Control | TMC Software/Integration | TMC Software/Integration of Ramp Control for ICM | San Francisco, California, United States | Estimated | 2008 | System | 2008 | $200,000.00 | 5 | View Details |