Unit Cost Entry
Unit Cost Element - Conduit Design and Installation - Corridor
Unit Cost Component - Conduit 1 - 50 mm (2 in.), Bored
Topeka, KS, USA
Description
furnish and install conduit
Cost Type
ActualData Date
5/20/2009Reported Units
Units
Linear Foot (LF)Year (Dollars)
2009Capital Cost per Unit ($)
$12.19O & M Cost per Unit ($)
Lifetime
yearsNotes
Converted from Meters. Unit cost was given as $40.00 per meter on bid sheet.Application Areas
None defined
Related Unit Cost Subsystems
Keywords
None defined
ID: 2011-01534

