Lesson
Consider the impact of different technical and design factors when making cost estimates for advanced parking management systems (APMS).
Experience from APMS deployment sites.
January 2007
BWI Airport,Baltimore,Maryland,United States; Seattle,Washington,United States; Chicago,Illinois,United States
Background (Show)
Lesson Learned
- At BWI, the unit cost of the equipment was approximately $450 per parking space. BWI stakeholders estimate that the system would have been more expensive if an existing facility had been retrofitted with the system’s equipment. THE APMS was estimated to cost between 2 and 5 percent of the overall construction cost of the new parking facility (excluding land costs).
- In Seattle, the cost per space varied widely depending on the facility type (garage or surface). The overall cost was driven to a large degree by the cost of getting the signs installed and linked to the central computer and to local power supplies.
- For the Chicago project, Metra will have a two year warranty period when the system becomes operational, during which time it will document operational costs such as staff time and materials. Metra expects that the annual electrical costs will be approximately $1680 to operate the seven signs.
Lesson Categories
None defined
Application Areas
Intelligent Transportation Systems > Arterial Management > Parking Management > Information Dissemination
Intelligent Transportation Systems > Arterial Management > Information Dissemination > Dynamic Message Signs
Intelligent Transportation Systems > Traveler Information > Tourism & Events > Advanced Parking
Intelligent Transportation Systems > Electronic Payment & Pricing > Parking Fee Payment
States
Countries
Focus Areas
Major Initiatives > Mobility Services for All Americans
Major Initiatives > Integrated Corridor Management Systems
Major Initiatives > Nationwide Surface Transportation Weather Observing and Forecasting System - Clarus
Major Initiatives > Emergency Transportation Operations
Other Program Activities > Amber Alert
Other Program Activities > Real Time Traveler Information
Other Program Activities > Rural ITS Deployment
Goal Areas
Keywords
DMS, CMS, VMS, Changeable Message Signs, Variable Message Signs, planned special events

Lesson Comments
No comments posted to date