<?xml version="1.0" encoding="UTF-8" ?>
<?xml-stylesheet title="XSL_formatting" type="text/xsl" href="RSSStyle.xslt"?>
<!--
Because the latest browser versions override styling I have to place a comment in this feed that is at least 512 bytes long in order for the feed to display the way I want it to display.  I realize that some
browsers will override this style sheet with one of their own, but for those that don't, we are trying to
make the subscription process as easy as possible with the helper fields and instruction text.
-->
<rss version="2.0">
<channel>
<title>Intelligent Infrastructure - Arterial Management Systems - Information Dissemination</title>
<description></description>
<link>http://www.itsoverview.its.dot.gov/AM.asp</link>
<key><![CDATA[http://www.itsbenefits.its.dot.gov/its/rssNewsFeed.nsf/RSSFeed?ReadForm&Intelligent%20Infrastructure%5EArterial%20Management%20Systems%5EInformation%20Dissemination]]></key>
<item><title>ITS Costs >> In  Wenatchee, Washington, the construction of a Transportation Management Center (TMC) and the installation of the associated ITS field equipment cost $460,000.</title><description><![CDATA[ITS Evaluation Framework - Phase 2 Continuation (2009) Seventeen Projects (June 2009)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>01/02/2013 09:48:17 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00259?OpenDocument&amp;Query=Home</link></item><item><title>ITS Benefits >> An overheight warning system at a CSX bridge in Maryland decreased the number of tractor-trailer incidents by 75 percent</title><description><![CDATA[CSX bridge clearance warning is doing its job          ITS Benefits Database     http://www.itsbenefits.its.dot.gov]]></description><pubDate>01/06/2012 05:09:01 PM</pubDate><link>http://www.itsbenefits.its.dot.gov/its/benecost.nsf/SummID/B2011-00750?OpenDocument&amp;Query=Home</link></item><item><title>ITS Benefits >> Simulation models show that real-time on-board driver assistance systems that recommend proper following distances can improve fuel economy by approximately 10 percent.</title><description><![CDATA[Development of Ecological Driving Assist System: Model Predictive Approach in Vehicle Control (21-25 September 2009)          ITS Benefits Database     http://www.itsbenefits.its.dot.gov]]></description><pubDate>08/24/2010 02:42:38 PM</pubDate><link>http://www.itsbenefits.its.dot.gov/its/benecost.nsf/SummID/B2010-00645?OpenDocument&amp;Query=Home</link></item><item><title>ITS Lessons >> Follow a modular approach when deploying complex projects in locations with a shortened construction season.</title><description><![CDATA[Integrated Corridor Traffic Management Final Evaluation Report  (April 2000)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>07/08/2010 11:35:37 AM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;DE15F990C72500BD8525775000504F08^Home</link></item><item><title>ITS Lessons >> Keep technical solutions open-ended in the early stages of an ITS research project, and follow a research-oriented contract vehicle.</title><description><![CDATA[Advanced Traveler Information System ATIS Implementation and Integration: Evaluation Report (May 16, 2007)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>06/16/2010 04:38:15 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;FE7D293D377EDA0685257742006F2140^Home</link></item><item><title>ITS Lessons >> Use Analysis, Modeling, and Simulation (AMS) to identify gaps, determine constraints, and invest in the best combination of Integrated Corridor Management (ICM) strategies.</title><description><![CDATA[Integrated Corridor Management: Analysis, Modeling, and Simulation Results for the Test Corridor (September 2008)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>12/11/2009 12:20:18 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;43CAB9C9CAF3435B8525767800548502^Home</link></item><item><title>ITS Costs >> Planning-level studies indicate that an effective combination of ICM strategies can be implemented for $7.5 Million per year (annualized capital and O&amp;M).</title><description><![CDATA[Integrated Corridor Management: Analysis, Modeling, and Simulation Results for the Test Corridor (September 2008)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>11/30/2009 03:55:47 PM</pubDate><link>http://www.itscosts.its.dot.gov/its/benecost.nsf/SummID/SC2009-00194?OpenDocument&amp;Query=Home</link></item><item><title>ITS Benefits >> Integrated Corridor Management (ICM) strategies that promote integration among freeways, arterials, and transit systems can help balance traffic flow and enhance corridor performance; simulation models indicate benefit-to-cost ratios for combined strategies range from 7:1 to 25:1.</title><description><![CDATA[Integrated Approach: Inside story on the ICM test corridor (2009)          ITS Benefits Database     http://www.itsbenefits.its.dot.gov]]></description><pubDate>11/06/2009 07:43:10 AM</pubDate><link>http://www.itsbenefits.its.dot.gov/its/benecost.nsf/SummID/B2009-00614?OpenDocument&amp;Query=Home</link></item><item><title>ITS Lessons >> Consult with traffic engineers early in the process of no-notice evacuations to secure the use of traffic management resources and to identify routes for evacuation and re-entry.</title><description><![CDATA[Technical Memorandum For Federal Highway Administration on Case Studies: Assessment of the State of the Practice and State of the Art in Evacuation Transportation Management - Task 3  (February 2006)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>10/23/2008 01:29:30 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;F2980E00AB90B230852574E9004B2DB9^Home</link></item><item><title>ITS Costs >> A modeling study evaluated the potential deployment of full ITS capabilities in Cincinnati.  The annualized life-cycle cost was estimated at $98.2 million.</title><description><![CDATA[Benefits and Costs of Full Operations and ITS Deployment: A 2003 Simulation for Cincinnati (May 2005)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>09/17/2008 03:34:03 PM</pubDate><link>http://www.itscosts.its.dot.gov/its/benecost.nsf/SummID/SC2008-00164?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> TMC central hardware costs can exceed $200,000 if regional communications and system integration are required.</title><description><![CDATA[Intelligent Transportation System Deployment Analysis System Customization: Technical Memorandum No.4 - Florida-Specific Intelligent Transportation System Deployment Costs Version 2 (5 August 2004)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>07/08/2008 11:51:44 AM</pubDate><link>http://www.itscosts.its.dot.gov/its/benecost.nsf/SummID/SC2008-00162?OpenDocument&amp;Query=Home</link></item><item><title>ITS Lessons >> Optimize travel time messaging operations by improving the way in which data is collected, analyzed, and displayed. </title><description><![CDATA[Travel Time Messaging on Dynamic Message Signs – Chicago, IL; Houston, TX, Nashville, TN, and Portland, OR (May, 2005)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>10/31/2007 01:41:49 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;775FC20E101EBE94852573780068EC4B^Home</link></item><item><title>ITS Lessons >> Develop a user-oriented system for displaying travel time messages on dynamic messages signs. </title><description><![CDATA[Travel Time Messaging on Dynamic Message Signs – Chicago, IL; Houston, TX, Nashville, TN, and Portland, OR (May, 2005)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>10/31/2007 01:41:24 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;46E785F142FE106485257378006598E4^Home</link></item><item><title>ITS Lessons >> Consider the impact of different technical and design factors when making cost estimates for advanced parking management systems (APMS).</title><description><![CDATA[Advanced Parking Management Systems: A Cross-Cutting Study - Taking the Stress Out of Parking (January 2007)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>07/12/2007 04:39:07 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;DFBE5838C369B1CF8525730100784EE3^Home</link></item><item><title>ITS Lessons >> Ensure proper operations and maintenance of advanced parking management systems  (APMS)</title><description><![CDATA[Advanced Parking Management Systems: A Cross-Cutting Study - Taking the Stress Out of Parking (January 2007)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>07/12/2007 04:38:55 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;FFD73E54A3A3FD698525730100765286^Home</link></item><item><title>ITS Lessons >> Identify key design issues in the deployment of advanced parking management systems (APMS).</title><description><![CDATA[Advanced Parking Management Systems: A Cross-Cutting Study - Taking the Stress Out of Parking (January 2007)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>07/12/2007 04:38:35 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;59F399508BCFC386852573010076186E^Home</link></item><item><title>ITS Lessons >> Involve all appropriate stakeholders in a formal and collaborative manner during each phase of the advanced parking management systems (APMS) project.</title><description><![CDATA[Advanced Parking Management Systems: A Cross-Cutting Study - Taking the Stress Out of Parking (January 2007)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>07/12/2007 04:38:30 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;B58F79BCEC407D438525730100747DC3^Home</link></item><item><title>ITS Lessons >> Use recommended practices to provide accurate travel time messages to the public using Dynamic Message Signs (DMS).</title><description><![CDATA[Dynamic Message Sign (DMS) Recommended Practice and Guidance (July 2004).          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov/]]></description><pubDate>01/31/2007 12:45:08 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;45E28761828DD11D85257260006BC296 </link></item><item><title>ITS Lessons >> Follow accepted guidelines to create concise, effective messages to communicate to the public using Dynamic Message Signs (DMS).</title><description><![CDATA[Changeable Message Sign Operation and Messaging Handbook (August 2004).          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov/]]></description><pubDate>01/31/2007 12:41:13 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;06D51ECB440E536E852572600069CB04 </link></item><item><title>New Lessons Database Entry >> Find innovative funding resources to help finance management and operations (M&amp;O) strategies and ITS.</title><description><![CDATA[     Getting More by Working Together - Opportunities for Linking Planning and Operations.  November 2004 .          ]]></description><pubDate>10/11/2006 12:13:40 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;ADD62E2288FBD36D8525707E0061C4CC</link></item></channel>
</rss>
