<?xml version="1.0" encoding="UTF-8" ?>
<?xml-stylesheet title="XSL_formatting" type="text/xsl" href="RSSStyle.xslt"?>
<!--
Because the latest browser versions override styling I have to place a comment in this feed that is at least 512 bytes long in order for the feed to display the way I want it to display.  I realize that some
browsers will override this style sheet with one of their own, but for those that don't, we are trying to
make the subscription process as easy as possible with the helper fields and instruction text.
-->
<rss version="2.0">
<channel>
<title>Intelligent Infrastructure - Crash Prevention &amp; Safety - Highway-Rail Crossing Warning Systems</title>
<description>Highway-Rail Crossing Warning Systems</description>
<link>http://www.itsoverview.its.dot.gov/Options.asp?System=CPS&amp;SubSystem=HRCS&amp;Tech=HighwayRail</link>
<key><![CDATA[http://www.itsbenefits.its.dot.gov/its/rssNewsFeed.nsf/RSSFeed?ReadForm&Intelligent%20Infrastructure%5ECrash%20Prevention%20&%20Safety%5EHighway%20Rail%20Crossing%20Systems]]></key>
<item><title>ITS Costs >> A modeling study evaluated the potential deployment of full ITS capabilities in Cincinnati.  The annualized life-cycle cost was estimated at $98.2 million.</title><description><![CDATA[Benefits and Costs of Full Operations and ITS Deployment: A 2003 Simulation for Cincinnati (May 2005)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>09/17/2008 03:34:03 PM</pubDate><link>http://www.itscosts.its.dot.gov/its/benecost.nsf/SummID/SC2008-00164?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> TMC central hardware costs can exceed $200,000 if regional communications and system integration are required.</title><description><![CDATA[Intelligent Transportation System Deployment Analysis System Customization: Technical Memorandum No.4 - Florida-Specific Intelligent Transportation System Deployment Costs Version 2 (5 August 2004)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>07/08/2008 11:51:44 AM</pubDate><link>http://www.itscosts.its.dot.gov/its/benecost.nsf/SummID/SC2008-00162?OpenDocument&amp;Query=Home</link></item><item><title>ITS Benefits >> In Los Angeles, California, the installation of a "second train coming" warning system at a light rail transit grade crossing reduced risky behavior of pedestrians and surveyed pedestrians felt that safety was improved.</title><description><![CDATA[Second Train Coming Warning Sign Demonstration Projects (November 2002)          ITS Benefits Database     http://www.itsbenefits.its.dot.gov]]></description><pubDate>05/28/2008 10:01:29 AM</pubDate><link>http://www.itsbenefits.its.dot.gov/its/benecost.nsf/SummID/B2008-00520?OpenDocument&amp;Query=Home</link></item><item><title>New Lessons Database Entry >> Find innovative funding resources to help finance management and operations (M&amp;O) strategies and ITS.</title><description><![CDATA[     Getting More by Working Together - Opportunities for Linking Planning and Operations.  November 2004 .          ]]></description><pubDate>10/11/2006 12:13:40 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;ADD62E2288FBD36D8525707E0061C4CC</link></item></channel>
</rss>
