<?xml version="1.0" encoding="UTF-8" ?>
<?xml-stylesheet title="XSL_formatting" type="text/xsl" href="RSSStyle.xslt"?>
<!--
Because the latest browser versions override styling I have to place a comment in this feed that is at least 512 bytes long in order for the feed to display the way I want it to display.  I realize that some
browsers will override this style sheet with one of their own, but for those that don't, we are trying to
make the subscription process as easy as possible with the helper fields and instruction text.
-->
<rss version="2.0">
<channel>
<title>Knowledge Resource Updates - Costs Database only</title>
<description>Costs of ITS implementations</description>
<link>http://www.itscosts.its.dot.gov/</link>
<key><![CDATA[http://www.itsbenefits.its.dot.gov/its/rssNewsFeed.nsf/RSSFeed?ReadForm&Knowledge%20Resource%20Updates%5ECosts%20Database%20only]]></key>
<item><title>ITS Costs >> Twenty year lifecycle costs of fixed spray anti-icing systems ranged from $1,031 to $1,096 per foot for two bridges in North Dakota.</title><description><![CDATA[Evaluation of North Dakota's Fixed Automated Spray Technology Systems (October 2009)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>05/09/2013 10:54:32 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2013-00283?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> Expanded traffic monitoring camera system cost estimated at $4.3M in Monroe County, PA.</title><description><![CDATA[Expanded traffic-cam system in Monroe County will cost PennDOT $4.3M (April 1, 2013)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>05/09/2013 10:54:22 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2013-00282?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> Costs for creating a statewide electronic crash data collection system range from $1.1 to 2.3 million.</title><description><![CDATA[I-95 Corridor Crash Data Reporting Methods: Final Report (2010)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>05/09/2013 10:54:17 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2013-00280?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> Cost of a province-wide, supplemental automated license plate reading system is $1,060,200 (CAN).</title><description><![CDATA[Evaluation of Automated License Plate Recognition for Improving British Columbia's Green Light Program (21-25 September 2009)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>05/09/2013 10:54:10 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2013-00279?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> The average cost to implement Adaptive Signal Control Technology is $28,725 per intersection.</title><description><![CDATA[Safety Benefits of Implementing Adaptive Signal Control Technology: Survey Results (January 2013)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>03/05/2013 09:22:32 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2013-00278?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> Six replacement dynamic message signs with remote activation capability cost $321,000 to procure and install in Idaho.</title><description><![CDATA[ITD updating electronic roadside signs to improve driver safety, awareness (February 7, 2013)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>03/05/2013 09:20:57 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2013-00276?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> Start-up costs for electronic screening ranged from $1 million to $2.8 million per state; average O&amp;M costs were about $160,000 per year.</title><description><![CDATA[Evaluation of the National CVISN Deployment Program: Volume 1 Final Report  (03/02/2009)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>01/02/2013 01:56:02 PM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2011-00231?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> Average per state start-up costs for CVISN safety information exchange (SIE) was estimated at $680,000; average annual O&amp;M was $74,000 per state.</title><description><![CDATA[Evaluation of the National CVISN Deployment Program: Volume 1 Final Report  (03/02/2009)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>01/02/2013 01:55:59 PM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2011-00230?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> Average per state start-up costs for electronic credentialing (EC) was estimated at $1.35 million; average annual O&amp;M was estimated at $250,000 per state.</title><description><![CDATA[Evaluation of the National CVISN Deployment Program: Volume 1 Final Report  (03/02/2009)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>01/02/2013 01:55:49 PM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2011-00229?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> Alaska's NewGen 511 Traveler Information System cost $440k to develop and $140k annually to operate.</title><description><![CDATA[Alaska New Gen 511 (April 2010)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>01/02/2013 09:50:26 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00263?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> In Vancouver, Washington, expanding the region's communications system by installing over 6 miles of fiber optic cable cost $1.5 million.</title><description><![CDATA[ITS Evaluation Framework - Phase 2 Continuation (2009) Seventeen Projects (June 2009)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>01/02/2013 09:50:23 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00258?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> Lane departure warning (LDW) systems sold in the United Kingdom ranged in price from $457 to $750 per vehicle (2009).</title><description><![CDATA[Cost Benefit Evaluation of Advanced Primary Safety Systems: Final Report (November 2011)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>01/02/2013 09:48:50 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00275?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> In Kent, Washington, the cost of connecting five arterial traffic signals and five CCTV cameras to a central signal system and another traffic management center was $92,000.</title><description><![CDATA[ITS Evaluation Framework - Phase 2 Continuation (2009) Seventeen Projects (June 2009)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>01/02/2013 09:48:34 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00262?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> In Edmonds, Washington, connecting six arterial traffic signals and five CCTV cameras to a central signal system cost $90,000.</title><description><![CDATA[ITS Evaluation Framework - Phase 2 Continuation (2009) Seventeen Projects (June 2009)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>01/02/2013 09:48:28 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00261?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> In Snohomish County, Washington, interconnecting five traffic signals and three CCTV cameras to a central signal system cost $91,000.</title><description><![CDATA[ITS Evaluation Framework - Phase 2 Continuation (2009) Seventeen Projects (June 2009)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>01/02/2013 09:48:21 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00260?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> In  Wenatchee, Washington, the construction of a Transportation Management Center (TMC) and the installation of the associated ITS field equipment cost $460,000.</title><description><![CDATA[ITS Evaluation Framework - Phase 2 Continuation (2009) Seventeen Projects (June 2009)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>01/02/2013 09:48:17 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00259?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> In Nisqually Valley, Washington, an Ice Warning System consisting of a road weather information system (RWIS) station and closed-circuit television (CCTV) camera cost $165,000.</title><description><![CDATA[ITS Evaluation Framework - Phase 2 Continuation (2009) Seventeen Projects (June 2009)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>01/02/2013 09:48:09 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00257?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> In Yakima, Washington, the deployment of a Traveler Information System cost $333,000.</title><description><![CDATA[ITS Evaluation Framework - Phase 2 Continuation (2009) Seventeen Projects (June 2009)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>01/02/2013 09:48:05 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00256?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> Deploying an advanced signal control system for 110 blocks in Midtown Manhattan cost $1.6 million.</title><description><![CDATA[New York Minutes: NYC's Adaptive Congestion Management System (August/September 2012)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>12/11/2012 09:37:46 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00274?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> An adaptive signal control system for 8 intersections in Woodland Park, CO was implemented for $176,300.</title><description><![CDATA[Adaptive Signal Timing Comparison between the InSync and QuicTrac Adaptive Signal Systems Installed in Colorado (July 2012)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>12/11/2012 09:37:40 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00273?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> An adaptive signal control system for 11 intersections in Greeley, CO was implemented for $905,500.</title><description><![CDATA[Adaptive Signal Timing Comparison between the InSync and QuicTrac Adaptive Signal Systems Installed in Colorado (July 2012)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>12/11/2012 09:37:36 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00272?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> The Virginia DOT implemented and operated a variable speed limit (VSL) system for two years on a 7.5 mile section of I-495 for $3.2 million (2008).</title><description><![CDATA[Work Zone Variable Speed Limit Systems: Effectiveness and System Design Issues (03/01/2010)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>12/07/2012 05:11:07 PM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00271?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> The cost to implement a multimodal trip planner can range from $138,000 to more than $4 million depending on the need to develop custom software and consolidate data feeds; open source software and data feeds from ISPs can decrease costs.</title><description><![CDATA[Multimodal Trip Planner System Final Evaluation Report (May 2011 )          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>11/01/2012 10:54:49 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2011-00228?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> Costs to deploy an Integrated Corridor Management (ICM) system in Minneapolis for ten years is estimated at $3.96 million.</title><description><![CDATA[Integrated Corridor Management: Analysis, Modeling, and Simulation for the I-394 Corridor in Minneapolis, Minnesota (November 2010)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>10/31/2012 01:37:11 PM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00270?OpenDocument&amp;Query=Home</link></item><item><title>ITS Costs >> "Thermal Eye" van and equipment for screening of commercial vehicles cost $500,000.</title><description><![CDATA[(Washington) Another eye on the road: WSP's high-tech patrol van detects unsafe trucks (4/11/2006)          ITS Costs Database     http://www.itscosts.its.dot.gov]]></description><pubDate>10/02/2012 08:43:07 AM</pubDate><link>http://www.itscosts.its.dot.gov/ITS/benecost.nsf/SummID/SC2012-00269?OpenDocument&amp;Query=Home</link></item></channel>
</rss>
