Sample unit cost consist of cost entries for ITS components that have been compiled from available sources, typically bid tabulation data from state DOTs. Costs are presented in the original year of expenditure and in inflation or index-adjusted dollars. For more information on Sample Unit Costs, see the Costs FAQ page.
Filters above this line apply immediately upon selection. Filters below require pressing 'Apply'.
Displaying 1 - 10 of 112
Identifier | Cost Subsystem | Unit Cost Element | Unit Cost Component | Description | Capital Cost Per Unit | OM Cost Per Unit | Adjusted Capital Cost Per Unit | Adjusted O&M Cost Per Unit | Reported Units | Lifetime | Location | Unit Cost Type | Unit | CPI ID | CPI Name | Year | Source | Associated System Cost |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
UC2011-01531 | Roadside Telecommunications (RS-TC) | Conduit Design and Installation - Corridor | Conduit 1 - 50 mm (2 in.), Trenched | furnish and install conduit |
$9.75 | $11.03 | Topeka, Kansas, United States | Actual | Linear Foot (LF) | 1 | WPU1176 | "KDOT Unit Costs 2009.pdf" -… | ||||||
UC2011-01532 | Roadside Telecommunications (RS-TC) | Conduit Design and Installation - Corridor | Conduit 1 - 75 mm (3 in.), Trenched | furnish and install conduit |
$11.28 | $12.76 | Topeka, Kansas, United States | Actual | Linear Foot (LF) | 1 | WPU1176 | "KDOT Unit Costs 2009.pdf" -… | ||||||
UC2011-01533 | Roadside Telecommunications (RS-TC) | Conduit Design and Installation - Corridor | Conduit 1 - 100 mm (4 in.), Trenched | furnish and install conduit |
$12.50 | $14.14 | Topeka, Kansas, United States | Actual | Linear Foot (LF) | 1 | WPU1176 | "KDOT Unit Costs 2009.pdf" -… | ||||||
UC2011-01534 | Roadside Telecommunications (RS-TC) | Conduit Design and Installation - Corridor | Conduit 1 - 50 mm (2 in.), Bored | furnish and install conduit |
$12.19 | $13.79 | Topeka, Kansas, United States | Actual | Linear Foot (LF) | 1 | WPU1176 | "KDOT Unit Costs 2009.pdf" -… | ||||||
UC2011-01535 | Roadside Telecommunications (RS-TC) | Conduit Design and Installation - Corridor | Conduit 2 - 50 mm (2 in.), Bored | furnish and install conduit |
$17.98 | $20.34 | Topeka, Kansas, United States | Actual | Linear Foot (LF) | 1 | WPU1176 | "KDOT Unit Costs 2009.pdf" -… | ||||||
UC2011-01536 | Non-ITS | Power Cable, 1/C #2 | furnish and install power cable |
$2.82 | $3.36 | Topeka, Kansas, United States | Actual | Linear Foot (LF) | 10 | General | "KDOT Unit Costs 2009.pdf" -… | |||||||
UC2011-01537 | Non-ITS | Power Cable, 1/C #8 | furnish and install power cable |
$1.60 | $1.90 | Topeka, Kansas, United States | Actual | Linear Foot (LF) | 10 | General | "KDOT Unit Costs 2009.pdf" -… | |||||||
UC2011-01538 | Non-ITS | Bare Ground, 1/C #2 | furnish and install bare ground conductor |
$2.21 | $2.63 | Topeka, Kansas, United States | Actual | Linear Foot (LF) | 10 | General | "KDOT Unit Costs 2009.pdf" -… | |||||||
UC2011-01539 | Non-ITS | Bare Ground, 1/C #8 | furnish and install bare ground conductor |
$1.37 | $1.63 | Topeka, Kansas, United States | Actual | Linear Foot (LF) | 10 | General | "KDOT Unit Costs 2009.pdf" -… | |||||||
UC2011-01540 | Roadside Telecommunications (RS-TC) | Fiber Optic Cable (12 SMFO) | Furnish single mode fiber optic cable. Does not include installation.… |
$2.36 | $2.67 | Topeka, Kansas, United States | Actual | Linear Foot (LF) | 1 | WPU1176 | "KDOT Unit Costs 2009.pdf" -… |