METHODOLOGY
The ECoTOp system co-optimizes traffic signal and vehicle dynamics to maximize the throughput from all phases in the cycle and minimize the total energy consumption of each CAV in all the…
METHODOLOGY
First, the eco-routing potential from the perspective of a carrier hauling truck fleet operating between different origin-destination pairs was explored in the form of expected cost-…
METHODOLOGY
The “Innovation Corridor” was set up as a testbed that can be used for CV testing. All of the traffic signal controllers along this corridor were upgraded to be compatible with Society of…
METHODOLOGY
A research team led by the Pacific Southwest Region University Transportation Center (UTC) developed a structured database that fused various datasets including real-world traffic state…
Project stakeholders should consider the advantages and disadvantages of requiring performance bonds and other risk mitigation requirements such as bid bonds (1) because they may not be appropriate…
In some cases, it may be advantageous for two or more agencies to partner when procuring similar technologies or equipment. For example, multiple agencies procuring mobile data terminals (MDTs) for…
To the extent possible, procuring agencies should conduct due diligence when issuing an RFP to help mitigate cost, schedule, and performance risks. Actions that can be taken at the pre-bid phase…