Benefit‐Cost Analysis for the I‐85/I‐40/NC‐540 Foundations for Automated and Safer Transportation Project 05/18/2020
Continuous Dynamic Optimization Impacts on ADA Paratransit Services: A Synthesis of Transit Practice 01/01/2023
Mobility on Demand (MOD) Sandbox Demonstration: Pierce Transit Limited Access Connections, Evaluation Report 11/01/2022
Connected Vehicle Pilot Final System Performance Measurement and Evaluation – WYDOT CV Pilot 07/27/2022